22 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

TheF Charging Espana Parking P1 Publico Meliá Alicante

Pl. Prta Del Mar 3, Alacant/Alicante (03002), Alicante/Alacant, Spain
Network OperatorThe F Charging Espana S.L.U.
Total Capacity2 bays (2 plugs)
GPS Coordinates38.34248, -0.47872
Official IDTTLWLPASGDJH8UZCH0RT
Official Registry DateFeb 23, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alacant/Alicante, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the The F Charging Espana S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeTTLWLPASGDJH8UZCH0RT
Post / EVSE Identifier #1MYW8V4KGZZGGRKBXDNNFJ9I2OX7
Post / EVSE Identifier #2ES*PWY*EL01370201
Post / EVSE Identifier #3377297660
Post / EVSE Identifier #4O0VULWD9YY6DZ7LKNLMPQA6YDDK
Post / EVSE Identifier #5ES*PWY*EL01370202
Post / EVSE Identifier #6377298461

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.342481 | Lon: -0.478724View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
950 m away

AYUNTAMIENTO DE ALICANTE (APEME)

Avenida Alfonso X El Sabio, 27 Alicante, Alicante
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)
1.4 km away

APK2 Carlet

Carlet 2
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
100 kW(Fast)🅿️Parking
2.5 km away

Parking Hospital General

Av. Pintor Baeza, 12
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.