22 kW• Semi-fastHorario habitualActive in MITECO registry

TF-SANTACRUZDETENERIFE-012

Los Molinos De Gofio,1, Orotava, La (38312), Santa Cruz de Tenerife, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity8 bays (8 plugs)
GPS Coordinates28.39375, -16.54852
Official ID2024001840
Official Registry DateMar 05, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Orotava, La, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001840
Post / EVSE Identifier #1COD20240000024364PR00004408
Post / EVSE Identifier #2ES*IBD*E164260
Post / EVSE Identifier #3174189
Post / EVSE Identifier #4COD20240000024365PR00004409
Post / EVSE Identifier #5ES*IBD*E164261
Post / EVSE Identifier #6174190
Post / EVSE Identifier #7COD20240000024366PR00004410
Post / EVSE Identifier #8ES*IBD*E164284
Post / EVSE Identifier #9174213
Post / EVSE Identifier #10COD20240000024367PR00004411
Post / EVSE Identifier #11ES*IBD*E164285
Post / EVSE Identifier #12174214
Post / EVSE Identifier #13COD20240000024368PR00004412
Post / EVSE Identifier #14ES*IBD*E164286
Post / EVSE Identifier #15174215
Post / EVSE Identifier #16COD20240000024369PR00004413
Post / EVSE Identifier #17ES*IBD*E164287
Post / EVSE Identifier #18174216
Post / EVSE Identifier #19COD20240000024370PR00004414
Post / EVSE Identifier #20ES*IBD*E164288
Post / EVSE Identifier #21174217
Post / EVSE Identifier #22COD20240000024371PR00004415
Post / EVSE Identifier #23ES*IBD*E164289
Post / EVSE Identifier #24174218

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Domingo (00:00 - 00:00) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30) Sabado (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.393754 | Lon: -16.548516View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
710 m away

US_296_La_Orotava

C/ Albañilería
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)
2.4 km away

61918020810010

Av. Loro Parque, 38400 Puerto De La Cruz,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)
2.4 km away

61918020810006

Avenida Loro Parque, 9
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.