22 kW• Semi-fast24/7Active in MITECO registry

TF-ADEJE-005

Archajara,10, Adeje (38670), Santa Cruz de Tenerife, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates28.12680, -16.74003
Official ID2024003875
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Adeje, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003875
Post / EVSE Identifier #1COD20240000033253PR00009344
Post / EVSE Identifier #2ES*IBD*E234423
Post / EVSE Identifier #3246487
Post / EVSE Identifier #4COD20240000033254PR00009345
Post / EVSE Identifier #5ES*IBD*E234424
Post / EVSE Identifier #6246488
Post / EVSE Identifier #7COD20240000033255PR00009346
Post / EVSE Identifier #8ES*IBD*E234425
Post / EVSE Identifier #9246489
Post / EVSE Identifier #10COD20240000033256PR00009347
Post / EVSE Identifier #11ES*IBD*E234426
Post / EVSE Identifier #12246490

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.1268 | Lon: -16.74003View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
200 m away

US_330CA_Adeje

Avenida De Ayyo
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
3.4 km away

Hotel Tivoli La Caleta

C. La Enramada, 9
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
22 kW(Semi-fast)
3.6 km away

62020013930041

C. Roque Nublo, 1, 38670 Costa Adeje, Santa
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.