22 kW• Semi-fast24/7Active in MITECO registry

Telpark - Catedral

Plaza La Constitución, 6, Albacete (02002), Albacete, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity6 bays (6 plugs)
GPS Coordinates38.99518, -1.85654
Official ID2025000201
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Albacete, belonging to the province of Albacete (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000201
Post / EVSE Identifier #1COD20250000048149PR00000611
Post / EVSE Identifier #2ES*EPK*EEVCC63271
Post / EVSE Identifier #33c3928a0-f2fd-11ed-86b5-47ab2dd60cca
Post / EVSE Identifier #4COD20250000048147PR00000609
Post / EVSE Identifier #5ES*EPK*EEVCC022831
Post / EVSE Identifier #6b13f40e0-2423-11eb-978f-df8b0cc89efc
Post / EVSE Identifier #7COD20250000048151PR00000613
Post / EVSE Identifier #8ES*EPK*EEVCC022811
Post / EVSE Identifier #9c9f40580-2423-11eb-978f-df8b0cc89efc
Post / EVSE Identifier #10COD20250000048146PR00000608
Post / EVSE Identifier #11ES*EPK*EEVCC022821
Post / EVSE Identifier #12d547a630-2423-11eb-978f-df8b0cc89efc
Post / EVSE Identifier #13COD20250000048148PR00000610
Post / EVSE Identifier #14ES*EPK*EEVCC63031
Post / EVSE Identifier #154c32d1c0-f2fd-11ed-86b5-47ab2dd60cca
Post / EVSE Identifier #16COD20250000048150PR00000612
Post / EVSE Identifier #17ES*EPK*EEVCC62961
Post / EVSE Identifier #18636a9350-f2fd-11ed-86b5-47ab2dd60cca

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.9951768 | Lon: -1.8565356View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
380 m away

APK2 El Sembrador

Plaza Del Sembrador C/ Alcalde Conangla S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
630 m away

APK2 Feria

Calle Feria S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.