22 kW• Semi-fast24/7Active in MITECO registry

Telpark - Atotxa

C/ Dolores Aguirre, 3, Donostia/San Sebastián (20012), Gipuzkoa, Spain
Network OperatorMAKSU ESPAÑA SL
Total Capacity6 bays (6 plugs)
GPS Coordinates43.31856, -1.97516
Official ID2025000212
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Donostia/San Sebastián, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the MAKSU ESPAÑA SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000212
Post / EVSE Identifier #1COD20250000048220PR00000682
Post / EVSE Identifier #2ES*EPK*EEVCC012621
Post / EVSE Identifier #333d128f2-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #4COD20250000048221PR00000683
Post / EVSE Identifier #5ES*EPK*EATO00061
Post / EVSE Identifier #6e50e0390-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #7COD20250000048225PR00000687
Post / EVSE Identifier #8ES*EPK*EEVCC012601
Post / EVSE Identifier #933d74375-c72e-11ea-9b85-c9ce18277160
Post / EVSE Identifier #10COD20250000048223PR00000685
Post / EVSE Identifier #11ES*EPK*EATO00041
Post / EVSE Identifier #12e551c350-7a4f-11ee-95f9-a90488899206
Post / EVSE Identifier #13COD20250000048222PR00000684
Post / EVSE Identifier #14ES*EPK*EATO00051
Post / EVSE Identifier #15e50acf45-7a4f-11ee-9bab-738191c13d0a
Post / EVSE Identifier #16COD20250000048224PR00000686
Post / EVSE Identifier #17ES*EPK*EEVCC012611
Post / EVSE Identifier #1833d399f6-c72e-11ea-9b85-c9ce18277160

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.318563 | Lon: -1.9751618View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
1.3 km away

APK2 Plaza Pío XII

Plaza Pío Xii S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
2.5 km away

SS-SanSebastian-001

Begiristain Dok. Ps,75
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.