150 kW• Ultra-fast24/7Active in MITECO registry

Tarragona, Spain

Autovia T-11, Exit 12, Tarragona (43110), Tarragona, Spain
Network OperatorTesla Spain SLU
Total Capacity2 bays (4 plugs)
GPS Coordinates41.13468, 1.16877
Official ID2024006384
Official Registry DateOct 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarragona, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the Tesla Spain SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
Tipo 2 (Mennekes)
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006384
Post / EVSE Identifier #1COD20240000043746PR00015883
Post / EVSE Identifier #2ES*TSL*E002J73
Post / EVSE Identifier #3c2776510-a9e1-45c2-86ce-e9fa5d29e3b5
Post / EVSE Identifier #4fe958ee1-193d-4713-b644-7310ac02118e
Post / EVSE Identifier #5COD20240000043747PR00015884
Post / EVSE Identifier #6ES*TSL*E002J71
Post / EVSE Identifier #7935c15a2-f6a1-4e74-9513-e3bb2440b7f5
Post / EVSE Identifier #89bd1770b-34d3-4a26-a32c-1c40b11b4e02

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.134685 | Lon: 1.16877View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.1 km away

GOmotor Reus

Avinguda Dels Mercaders, 2
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 4 plugs
Details
350 kW(Ultra-fast)
1.2 km away

Tarragona

Autovía Del Mediterráneo, A-7
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
6 points • 6 plugs
Details
22 kW(Semi-fast)
2.8 km away

T-REUS-004

Josep Maria Folch I Torres,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.