50 kW• Fast24/7Active in MITECO registry

SS-Astigarraga-001

Inaxio Berasarte Hiribidea,8, Astigarraga (20115), Gipuzkoa, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (5 plugs)
GPS Coordinates43.28190, -1.91671
Official ID2024000400
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Astigarraga, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000400
Post / EVSE Identifier #1COD20240000018461PR00001176
Post / EVSE Identifier #2ES*IBD*E163977
Post / EVSE Identifier #3173896
Post / EVSE Identifier #4COD20240000018462PR00001177
Post / EVSE Identifier #5ES*IBD*E163986
Post / EVSE Identifier #6173885
Post / EVSE Identifier #7173884
Post / EVSE Identifier #8COD20240000018463PR00001178
Post / EVSE Identifier #9ES*IBD*E163987
Post / EVSE Identifier #10173886
Post / EVSE Identifier #11COD20240000018464PR00001179
Post / EVSE Identifier #12ES*IBD*E163988
Post / EVSE Identifier #13173887

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.281902 | Lon: -1.916705View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
2.2 km away

Petritegi Sagardotegia

Petritegi Bidea, 8
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
4.4 km away

SS-SanSebastian-001

Begiristain Dok. Ps,75
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.