60 kW• Fast24/7Active in MITECO registry

SN2210060695

Av. Del Río Boladiez, 45007 Toledo, Spain, Toledo (45007), Toledo, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates39.86235, -3.97526
Official ID2024005699
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Toledo, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005699
Post / EVSE Identifier #1COD20240000042422PR00014567
Post / EVSE Identifier #2ES*ESX*ESN22100606951
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000042423PR00014568
Post / EVSE Identifier #5ES*ESX*ESN22100606952
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000042424PR00014569
Post / EVSE Identifier #8ES*ESX*ESN22100606953
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Lunes (00:00 - 00:00) Martes (00:00 - 00:00) Domingo (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Viernes (00:00 - 00:00) Sabado (00:00 - 00:00)

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.862353 | Lon: -3.975258View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
140 m away

Toledo, Spain

Av. Del Río Boladiez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
11 kW(Semi-fast)
1.4 km away

NUEVO HOSPITAL DE TOLEDO

AVENIDA DEL RIO GUADIANA, SN
Operator:REMO SUSTAINABLE MOBILITY S.L
Tipo 2 (Mennekes)
34 points • 34 plugs
Details
60 kW(Fast)
1.6 km away

US_55_Toledo_II

Calle Río Jarama
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.