7.3 kW• Standard24/7Active in MITECO registry

SG-Carbonero el Mayor-01

Segovia,33, Carbonero el Mayor (40270), Segovia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates41.11843, -4.26280
Official ID2024000449
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Carbonero el Mayor, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000449
Post / EVSE Identifier #1COD20240000018608PR00001323
Post / EVSE Identifier #2ES*IBD*E8874
Post / EVSE Identifier #39434
Post / EVSE Identifier #4COD20240000018609PR00001324
Post / EVSE Identifier #5ES*IBD*E8875
Post / EVSE Identifier #69435
Post / EVSE Identifier #7COD20240000018610PR00001325
Post / EVSE Identifier #8ES*IBD*E8893
Post / EVSE Identifier #99456
Post / EVSE Identifier #10COD20240000018611PR00001326
Post / EVSE Identifier #11ES*IBD*E8894
Post / EVSE Identifier #129457

Theoretical Charging Times at Maximum Power (7.3 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 44 min(~2.7 hours)
40 kWh Battery~5 h 29 min(~5.5 hours)
60 kWh Battery~8 h 13 min(~8.2 hours)
80 kWh Battery~10 h 58 min(~11 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.118435 | Lon: -4.262797View on OpenStreetMap →

Other Nearby Charging Stations

110 kW(Fast)
7.6 km away

Navatrans Transportes

14,82
Operator:CHARGING TOGETHER SL
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
8 points • 11 plugs
Details
22 kW(Semi-fast)
20.7 km away

CENTRO CULTURAL ESPIRDO

C/ Segovia, 17 Espirdo, Segovia
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.