11.09 kW• Semi-fast24/7Active in MITECO registry

Seur Logroño

Las Cañas 0001, Logroño (26009), Rioja, La, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates42.47855, -2.40691
Official IDG8NGLTG0WTIZHE7AOTXL
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Logroño, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11.09 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeG8NGLTG0WTIZHE7AOTXL
Post / EVSE Identifier #19ARSBOC3DTNYNNEXZN1QBGUYUMM
Post / EVSE Identifier #2ES*REP*E9864*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4T3ZO8RJQDLG3VMB4THPFPXTJYSA
Post / EVSE Identifier #5ES*REP*E9864*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7XGU5COHMBCQSLJMOSSMHTKYBYXD
Post / EVSE Identifier #8ES*REP*E17025*1
Post / EVSE Identifier #9BH3VYAU4HEH7BTHGGT8Y5QQK9OU
Post / EVSE Identifier #10ES*REP*E17025*2

Theoretical Charging Times at Maximum Power (11.09 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 48 min(~1.8 hours)
40 kWh Battery~3 h 36 min(~3.6 hours)
60 kWh Battery~5 h 25 min(~5.4 hours)
80 kWh Battery~7 h 13 min(~7.2 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.478547 | Lon: -2.406905View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
1.9 km away

AUDI RIOJA MOTOR

Avda. Puntido Nave 4 Pol. Ind. Las Cañas,S/N
Operator:CHARGING TOGETHER SL
CCS Combo 2
2 points • 2 plugs
Details
150 kW(Ultra-fast)
1.9 km away

E-LO-Logroño-007

Las Cañas,22
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
2.0 km away

Hostal Mesón Pepa

Av. Aragón, 9
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.