150 kW• Ultra-fast24/7Active in MITECO registry

Sede Asociación Empresarios Polígono San Cibrao

Ricardo Martín Esperanza,17, San Cibrao das Viñas (32901), Ourense, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates42.28904, -7.82006
Official IDHS6LFXODGHMYIJZBRTYG
Official Registry DateAug 07, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Cibrao das Viñas, belonging to the province of Ourense (Galicia, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeHS6LFXODGHMYIJZBRTYG
Post / EVSE Identifier #1LFF6QY0XE4DJ5U2JPJKNHPVXSVI
Post / EVSE Identifier #2ES*FCT*E232337
Post / EVSE Identifier #3244589
Post / EVSE Identifier #4VPZO74QNDSPKN9HTMVXWJMMYVXV
Post / EVSE Identifier #5ES*FCT*E232338
Post / EVSE Identifier #6244590

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.289038 | Lon: -7.820058View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
340 m away

US_226_San_Cibrao

Calle Ricardo Martín Esperanza S/N
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
150 kW(Ultra-fast)
3.3 km away

E-OU-Ourense-001

Madrid,231
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.