50 kW• Fast24/7Active in MITECO registry

SE-LaRinconada-002

G Unidad,S/N, Rinconada, La (41300), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity1 bay (2 plugs)
GPS Coordinates37.47924, -5.95845
Official ID2024001001
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Rinconada, La, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001001
Post / EVSE Identifier #1COD20240000019945PR00002981
Post / EVSE Identifier #2ES*IBD*E219195
Post / EVSE Identifier #3231082
Post / EVSE Identifier #4231081

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.479245 | Lon: -5.958446View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
5.8 km away

Senda 5

Carretera Sevilla, 5, 41015 Sevilla, Spain
Operator:Punto Recargas SL
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.