22 kW• Semi-fast24/7Active in MITECO registry

Sant Andreu de Llavaneres - SELBA EdRSR 1 Platja

Av. Can Sans, 8, Sant Andreu de Llavaneres (08392), Barcelona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (2 plugs)
GPS Coordinates41.55609, 2.49777
Official ID2RXUYF91UGBKMDXA8WIS
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Andreu de Llavaneres, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2RXUYF91UGBKMDXA8WIS
Post / EVSE Identifier #1HUT4VTRL1ZWRIBJOJMQUZVESLUL
Post / EVSE Identifier #2ES*ETE*E14636
Post / EVSE Identifier #3328588
Post / EVSE Identifier #4246UQVFW0DOXSXRUMOOBPKMA6YM
Post / EVSE Identifier #5ES*ETE*E14637
Post / EVSE Identifier #6328589

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.556093 | Lon: 2.49777View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
4.9 km away

1224303950031

Pl. De Santa Anna, 08302 Mataró, Barcelona,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
50 kW(Fast)⛽Gasolinera Petroprix
5.4 km away

Petroprix Mataró

Calle Energía 1
Operator:EDP CLIENTES SAU
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.