150 kW• Ultra-fast24/7Active in MITECO registry

San Vicente del Raspeig

Network OperatorGalp Energía España, S.A.U.
Total Capacity1 bay (2 plugs)
GPS Coordinates38.40150, -0.53539
Official ID2024004576
Official Registry DateAug 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Vicent del Raspeig/San Vicente del Raspeig, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the Galp Energía España, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004576
Post / EVSE Identifier #1COD20240000036757PR00011892
Post / EVSE Identifier #2ES*DLP*E0907P01
Post / EVSE Identifier #3324 IZQ
Post / EVSE Identifier #4324 DCHA

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.4015017 | Lon: -0.5353924View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🅿️Parking
5.9 km away

Parking Hospital General

Av. Pintor Baeza, 12
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.