7.59 kW• Semi-fast24/7Active in MITECO registry

San Fernando - Mercado Centro

C/ Hermanos Laulhé, S/N, San Fernando (11100), Cádiz, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity8 bays (8 plugs)
GPS Coordinates36.46620, -6.19972
Official IDTPC7SZZI6CDGMABRXRZV
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Fernando, belonging to the province of Cádiz (Andalucía, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeTPC7SZZI6CDGMABRXRZV
Post / EVSE Identifier #1RAVZVHZB0GRK8FP2MCUOAJECEKD
Post / EVSE Identifier #2ES*IPK*E7976222
Post / EVSE Identifier #31
Post / EVSE Identifier #4UBEXJ71LEQH69AP2D1KCNIXM26U
Post / EVSE Identifier #5ES*IPK*E7976223
Post / EVSE Identifier #6BBV6VOBRRGFX9Z76W1ET9JYIIX2
Post / EVSE Identifier #7ES*IPK*E7976224
Post / EVSE Identifier #8WUULOPGTN3ZCMXO4A93XQVSLWZ6
Post / EVSE Identifier #9ES*IPK*E7976225
Post / EVSE Identifier #10OAJLHS39NUNWS0TEE1OLICEGOO7
Post / EVSE Identifier #11ES*IPK*E7976226
Post / EVSE Identifier #12F1SZO3TV96IYLLO8AOHCJHGEJIV
Post / EVSE Identifier #13ES*IPK*E7976227
Post / EVSE Identifier #14QCZBKYW09DCWMIMIIVB1DYZF2QS
Post / EVSE Identifier #15ES*IPK*E7976220
Post / EVSE Identifier #16HAVZIJKOQ7YIFE3F5MUC7HKI7OA
Post / EVSE Identifier #17ES*IPK*E7976221

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Lunes (00:00 - 00:00) Martes (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.466196 | Lon: -6.199715View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
2.1 km away

US_130_San_Fernando

C/ Prolongación De La Granja
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.