50 kW• Fast24/7Active in MITECO registry

Restaurante Moma

Avenida Diputacion S/N Cruce, Atarfe (18230), Granada, Spain
Network OperatorPunto Recargas SL
Total Capacity3 bays (3 plugs)
GPS Coordinates37.21648, -3.69147
Official ID2024001821
Official Registry DateJan 18, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Atarfe, belonging to the province of Granada (Andalucía, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001821
Post / EVSE Identifier #1COD20240000017372PR00004316
Post / EVSE Identifier #2ES*PWH*EMOMGRAKEM00411
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000017373PR00004317
Post / EVSE Identifier #5ES*PWH*EMOMGRAKEM00412
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20240000017374PR00004318
Post / EVSE Identifier #8ES*PWH*EMOMGRAKEM00413
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.216475 | Lon: -3.691467View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
4.9 km away

KIA Granada

Pol. Ind. Fatinafar, Av. De Andalucía S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.