360 kW• Ultra-fast24/7Active in MITECO registry

Rest. El Lagar de Milagros Upgrade

Av. De Castilla, 53, Adrada de Haza (09462), Burgos, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity5 bays (5 plugs)
GPS Coordinates41.57316, -3.70457
Official IDZIPI4CTPHC32BTM4QY9V
Official Registry DateJun 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Adrada de Haza, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:900 A
2Charging Bay #2
1 connector available
CCS Combo 2
360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:900 A
3Charging Bay #3
1 connector available
CCS Combo 2
360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:900 A
4Charging Bay #4
1 connector available
CCS Combo 2
360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:900 A
5Charging Bay #5
1 connector available
CCS Combo 2
360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:900 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZIPI4CTPHC32BTM4QY9V
Post / EVSE Identifier #1OEJAXTWQ7JB9WDTYQED5KYUXFSH
Post / EVSE Identifier #2ES*WEN*ELAGARMILAGROS42
Post / EVSE Identifier #387c70f42-bbaa-448d-c75b-e40e623d23a2
Post / EVSE Identifier #4XGZ1RUDKOQUQGEVBHWY1AYNYUBC
Post / EVSE Identifier #5ES*WEN*ELAGARMILAGROS41
Post / EVSE Identifier #676ed0ed9-aac7-bd48-ff5b-b884b4afc9a7
Post / EVSE Identifier #7JQFKHNPIPZZ7D8DWM6SEPAG9KXY
Post / EVSE Identifier #8ES*WEN*ELAGARMILAGROS51
Post / EVSE Identifier #9e0e3eba4-068b-1e45-9f85-73535bb18f60
Post / EVSE Identifier #102HMFZHQZJD3UYVUIBPFLWNRYAST
Post / EVSE Identifier #11ES*WEN*ELAGARMILAGROS31
Post / EVSE Identifier #127540d731-f3f4-6e27-f716-cfbf680196c1
Post / EVSE Identifier #131HATJFE5SHBQIYYAVI7PN8HG9DH
Post / EVSE Identifier #14ES*WEN*ELAGARMILAGROS32
Post / EVSE Identifier #1595d897cf-3183-c2aa-e899-72004b885b60

Theoretical Charging Times at Maximum Power (360 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0.1 hours)
40 kWh Battery~7 min(~0.1 hours)
60 kWh Battery~10 min(~0.2 hours)
80 kWh Battery~13 min(~0.2 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.573156 | Lon: -3.70457View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
0 m away

Rest. El Lagar de Milagros

Av. De Castilla, 53
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
8 points • 8 plugs
Details
350 kW(Ultra-fast)
2.4 km away

IONITY Milagros

A-1, Km 149
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.