180 kW• Ultra-fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, E.S. Utges, S.L.

Carretera Ll-11, P.K. 9,00 Iz, Lleida (25191), Lleida, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates41.61482, 0.65275
Official IDGNVX34FKLZ7YZMV3ZW7E
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lleida, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
CCS Combo 2
120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGNVX34FKLZ7YZMV3ZW7E
Post / EVSE Identifier #1XYBEFJLWXUGWVGK7BEX0ZIT9AVZ
Post / EVSE Identifier #2ES*REP*E14792*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4ACDIGM6HDHITKPEIVYK5YMDA1WY
Post / EVSE Identifier #5ES*REP*E14792*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7WDHBVDMBT8JB6TPEXCCNHDPUBRF
Post / EVSE Identifier #8ES*REP*E14793*1
Post / EVSE Identifier #9LEGAS0EM2QF0KOKCPMUQQDOV8TC
Post / EVSE Identifier #10ES*REP*E14793*2

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.614822 | Lon: 0.652746View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.3 km away

L-Lleida-011

Josep Segura Farré,701
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.