50 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, Elepra 2013

C. Sta. Apolonia,44, Avilés (33403), Asturias, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (3 plugs)
GPS Coordinates43.54616, -5.90530
Official IDO2CBVV2TVUHPCPHGLYBW
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Avilés, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeO2CBVV2TVUHPCPHGLYBW
Post / EVSE Identifier #1FBIQFT7EYHGEAJ4JV6EMELAAIDP
Post / EVSE Identifier #2ES*REP*E17061*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.546161 | Lon: -5.905303View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
16.4 km away

O-Oviedo-016

Peña Santa (Pg.Silvota),15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
10 points • 10 plugs
Details
320 kW(Ultra-fast)
18.3 km away

Centro Porsche Asturias CP 2

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
320 kW(Ultra-fast)
18.3 km away

Centro Porsche Asturias CP 1

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.