50 kW• Fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, CRED Chinales

C/ Cr N-432, 269,2, Córdoba (14007), Córdoba, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity1 bay (3 plugs)
GPS Coordinates37.89720, -4.76674
Official IDSBBTEKYTA2POKINOEQRD
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Córdoba, belonging to the province of Córdoba (Andalucía, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeSBBTEKYTA2POKINOEQRD
Post / EVSE Identifier #1PKT5CDT7LN6OEWCWKTGWBEKEJBX
Post / EVSE Identifier #2ES*REP*E14332*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.897197 | Lon: -4.766739View on OpenStreetMap →

Other Nearby Charging Stations

180 kW(Ultra-fast)
1.0 km away

C8A233S023DXEJQQSX-

Avda. De Libia, 34, 37004 Córdoba, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 2 plugs
Details
22 kW(Semi-fast)
1.1 km away

E-CO-Cordoba-006

Ronda De La Manca,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
250 kW(Ultra-fast)
1.7 km away

Córdoba, Spain

Calle Gema, 7
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.