180 kW• Ultra-fast⛽Estación Repsol24/7Active in MITECO registry

Repsol ES, CRED BEJAR II

Cr N-630, 412 D, Béjar (37700), Salamanca, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity2 bays (5 plugs)
GPS Coordinates40.38966, -5.75081
Official IDMIN8NCQXLSZ9YPRUXPQP
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Béjar, belonging to the province of Salamanca (Castilla y León, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
43.65 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
2 connectors available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CHAdeMO
180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMIN8NCQXLSZ9YPRUXPQP
Post / EVSE Identifier #1VKOPBO3SYFIHLZUO9K7ABXCQLRR
Post / EVSE Identifier #2ES*REP*E17062*1
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #6E4CX9JUQZEHYTYQNXOAXPHF6MZC
Post / EVSE Identifier #7ES*REP*E17063*1

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.389664 | Lon: -5.750808View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
180 m away

E-SA-Bejar-002

Salamanca,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
50 kW(Fast)
190 m away

SA-Bejar-002

Obispo Zarranz Y Pueyo,60
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
50 kW(Fast)⛽Estación Repsol
1.2 km away

Repsol ES, CRED Bejar I

Cl Crta De Salamanca, 3
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.