22 kW• Semi-fast24/7Active in MITECO registry

QWELLO - Idorsolo Kalea 15

Calle Idorsolo 15, Derio (48160), Bizkaia, Spain
Network OperatorQWELLO España SL
Total Capacity4 bays (8 plugs)
GPS Coordinates43.29749, -2.88710
Official ID5UJMFXQNAJ3PNSNSIFHR
Official Registry DateJan 20, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Derio, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the QWELLO España SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
4Charging Bay #4
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code5UJMFXQNAJ3PNSNSIFHR
Post / EVSE Identifier #1IRFSM9EDIUVRHX54D9IFEG697VA
Post / EVSE Identifier #2ES*AEQ*ESAEQEHPWJP11
Post / EVSE Identifier #3ESAEQEHPWJP11-11
Post / EVSE Identifier #4ESAEQEHPWJP11-22
Post / EVSE Identifier #55JPDZMVCO0NFOIOON0IOR8FQLWP
Post / EVSE Identifier #6ES*AEQ*ESAEQEHPWJP211
Post / EVSE Identifier #7ESAEQEHPWJP21 22
Post / EVSE Identifier #8ESAEQEHPWJP21 11
Post / EVSE Identifier #9SZWNMEALKMYDOAUV4ONJLXG5TCE
Post / EVSE Identifier #10ES*AEQ*ESAEQEHPWJP311
Post / EVSE Identifier #11ESAEQEHPWJP31 22
Post / EVSE Identifier #12ESAEQEHPWJP31 11
Post / EVSE Identifier #135UCJJCJJ9CLSVB3K6ATEFFUPYKG
Post / EVSE Identifier #14ES*AEQ*ESAEQEHPWJP411
Post / EVSE Identifier #15ESAEQEHPWJP41 22
Post / EVSE Identifier #16ESAEQEHPWJP41 11

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CON CHIP
✓COMPATIBLE CON TARJETAS CONTACTLESS
📅Advance slot reservation supported
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.2974931 | Lon: -2.88710465View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
4.3 km away

BI-Lezama-003

Garaioltza,146
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)
5.0 km away

BI-Bilbao-012

Abandoibarra,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.