22 kW• Semi-fast24/7Active in MITECO registry

QWELLO - Carretera Torrenostra 6

Carretera Torrenostra 6, Torreblanca (12596), Castellón/Castelló, Spain
Network OperatorQWELLO España SL
Total Capacity4 bays (4 plugs)
GPS Coordinates40.19557, 0.22399
Official IDTZHSYKVAPCEEKWINNRQV
Official Registry DateDec 18, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torreblanca, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the QWELLO España SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeTZHSYKVAPCEEKWINNRQV
Post / EVSE Identifier #1OZBMHZWVZ7VDIT25NO1UC6NE9NN
Post / EVSE Identifier #2ES*AEQ*ESAEQE8JW5811
Post / EVSE Identifier #3ESAEQE8JW5811
Post / EVSE Identifier #4FIB6IHSUE0JMHQUNUKIXTEEFMEP
Post / EVSE Identifier #5ES*AEQ*ESAEQE8JW5812
Post / EVSE Identifier #6ESAEQE8JW5812
Post / EVSE Identifier #7BBVJ5YV2TIEDKKMK3GUPYYLLPZA
Post / EVSE Identifier #8ES*AEQ*ESAEQE8JW5821
Post / EVSE Identifier #9ESAEQE8JW5821
Post / EVSE Identifier #10L2LJ0FJTEPLWS6LLWXOEIBMP7F6
Post / EVSE Identifier #11ES*AEQ*ESAEQE8JW5822
Post / EVSE Identifier #12ESAEQE8JW5822

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CON CHIP
✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓COMPATIBLE CON TARJETAS CONTACTLESS
📅Advance slot reservation supported

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.1955696 | Lon: 0.223992764View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)🛒Supermercado Consum
3.3 km away

Supermercado Consum Torreblanca

Carrer De Saragossa, 44, 12596 Torreblanca, Castelló
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
2 points • 2 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
3.9 km away

Hotel Miramar

Av. Valencia, 6
Operator:Wenea Services Spain, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
20.4 kW(Semi-fast)
7.3 km away

20XP22T3KK4AL00848

Camino De L'ajup, 12, 12579 Alcossebre,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.