22 kW• Semi-fast24/7Active in MITECO registry

PORTAJE

C. Laguna, Sn, Portaje (10883), Cáceres, Spain
Network OperatorOESTE SOLUCIONES ENERGETICAS, S.L.
Total Capacity1 bay (2 plugs)
GPS Coordinates39.91950, -6.55969
Official ID2024001987
Official Registry DateMar 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Portaje, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the OESTE SOLUCIONES ENERGETICAS, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001987
Post / EVSE Identifier #1COD20240000024980PR00005022
Post / EVSE Identifier #2ES*OSE*E12412
Post / EVSE Identifier #32
Post / EVSE Identifier #41

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Viernes (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.9195 | Lon: -6.559694View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
7.3 km away

22XP22T3KK4AK00027

Ctra. Puente Nuevo, 15, 10800 Coria,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
24 kW(Semi-fast)⛽Estación Repsol
7.5 km away

Repsol, DC - Coria

Avda. Extremadura, 8-A
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
50 kW(Fast)⛽Estación Repsol
8.4 km away

Repsol, DC - Torrejoncillo

Travesía Jenaro Ramos S/N
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.