7.36 kW• Standard🅿️Parking24/7Active in MITECO registry

Petronor Parking Contratistas

San Martín , 5, Muskiz (48550), Bizkaia, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates43.32422, -3.11799
Official IDBNX71MFIWFQ7YKFHJX4Z
Official Registry DateJun 01, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Muskiz, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.36 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeBNX71MFIWFQ7YKFHJX4Z
Post / EVSE Identifier #1NJ9YXAZR4E0BF5C7EQHTHMQFZ4C
Post / EVSE Identifier #2ES*REP*E18212*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4CXP9XOW4M4YNTFYQKJ4CAJPUXBY
Post / EVSE Identifier #5ES*REP*E18212*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7SMNPOS7GBCJZJT3CJ8OOUXZEFBI
Post / EVSE Identifier #8ES*REP*E18235*1
Post / EVSE Identifier #9RY69GCGV4MFLTRGKQON5I6KAIPB
Post / EVSE Identifier #10ES*REP*E18235*2

Theoretical Charging Times at Maximum Power (7.36 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 43 min(~2.7 hours)
40 kWh Battery~5 h 26 min(~5.4 hours)
60 kWh Battery~8 h 9 min(~8.2 hours)
80 kWh Battery~10 h 52 min(~10.9 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.32422 | Lon: -3.117994View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
6.9 km away

BI-Santurtzi-001

Puerto Pesquero,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7 kW(Standard)
7.2 km away

BI-Trapaga-002

Juan Sebastian Elkano,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial
7.8 km away

Centro Comercial Ballonti

Av. Ballonti, 1, 48920 Portugalete, Vizcaya,
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.