50 kW• Fast24/7Active in MITECO registry

Peñíscola, Zona Llandels

Camino Cervera C/Puntarró Peñiscola, Peníscola/Peñíscola (12598), Castellón/Castelló, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates40.36536, 0.39595
Official IDPQ7SN6UMBHS0ONAOTBPQ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Peníscola/Peñíscola, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodePQ7SN6UMBHS0ONAOTBPQ
Post / EVSE Identifier #1N5FEJ0JMB9LZOF2J16DVJT7C1SW
Post / EVSE Identifier #2ES*REP*E17803*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4RRGDLIPSNDMK610LSROPPCJD1UT
Post / EVSE Identifier #5ES*REP*E17803*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7F2ZGY7JPM4U34D7EYKFRN6II5XG
Post / EVSE Identifier #8ES*REP*E17804*1
Post / EVSE Identifier #9AGF4V3OW7UDTJCP86Y2EWUFUEGX
Post / EVSE Identifier #10ES*REP*E17804*2

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.365364 | Lon: 0.395947View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
590 m away

E-CS-Peñiscola-001

Siete,111
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
22 kW(Semi-fast)
650 m away

Telpark - Voramar

Avda. Del Mar S/N
Operator:MAKSU ESPAÑA SL
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.