14.4 kW• Semi-fast24/7Active in MITECO registry

Parque Principado

Autovía A-66, Km. 4,5 Acceso Santander, Siero (33429), Asturias, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity2 bays (4 plugs)
GPS Coordinates43.39060, -5.80286
Official ID2023002226
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Siero, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
14.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002226
Post / EVSE Identifier #1COD20230000011480PR00000496
Post / EVSE Identifier #2ES*EDP*E00214
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20230000011481PR00000497
Post / EVSE Identifier #6ES*EDP*E00215

Theoretical Charging Times at Maximum Power (14.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 23 min(~1.4 hours)
40 kWh Battery~2 h 47 min(~2.8 hours)
60 kWh Battery~4 h 10 min(~4.2 hours)
80 kWh Battery~5 h 33 min(~5.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI. Additional amenities: CENTRO COMERCIAL, PARADA DE TAXI, RESTAURANTE, WIFI, ESTACIÓN DE SERVICIO, ESTACIÓN DE TREN, PARADA DE AUTOBÚS, ZONA RECREATIVA, SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.390596 | Lon: -5.802863View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
350 m away

E-33-Amieva-001

Autovia A,66
Operator:IBERDROLA CLIENTES S.A.U
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
2 points • 4 plugs
Details
320 kW(Ultra-fast)
1.2 km away

Centro Porsche Asturias CP 2

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
320 kW(Ultra-fast)
1.2 km away

Centro Porsche Asturias CP 1

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.