22 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

Parking Plaza Constitución - Parkia

Pl. De La Constitucion, S/N, Ciudad Real (13003), Ciudad Real, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates38.98813, -3.92828
Official ID2024005477
Official Registry DateApr 01, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ciudad Real, belonging to the province of Ciudad Real (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005477
Post / EVSE Identifier #1COD20240000041959PR00014109
Post / EVSE Identifier #2ES*WEN*EPARKIAPLC041
Post / EVSE Identifier #38e2135df-54ae-8779-4547-098683833cc0
Post / EVSE Identifier #4COD20240000041960PR00014110
Post / EVSE Identifier #5ES*WEN*EPARKIAPLC031
Post / EVSE Identifier #6d8ea6600-75c0-3932-b9ff-846712171aaa
Post / EVSE Identifier #7COD20240000041961PR00014111
Post / EVSE Identifier #8ES*WEN*EPARKIAPLC021
Post / EVSE Identifier #923acb826-6630-61bf-4f7d-798ace3e50b1
Post / EVSE Identifier #10COD20240000041962PR00014112
Post / EVSE Identifier #11ES*WEN*EPARKIAPLC011
Post / EVSE Identifier #12564fceee-5f64-5209-4ef7-cbad93216851

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.988126 | Lon: -3.928284View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)🅿️Parking
10 m away

62009004500049

Parking Parkia - Plaza De La Constitución
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)🅿️Parking
40 m away

62008004490025

Parking Parkia - Plaza De La Constitucion
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
80 kW(Fast)
750 m away

E-Leclerc Ciudad Real

Carr. De Porzuna, 24, 13005 Ciudad Real, Spai
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
10 points • 10 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.