22 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

Parking Playa de los Cristianos. Arona - Parkia

C. Del Valle Menéndez, S/N, Arona (38650), Santa Cruz de Tenerife, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates28.05153, -16.71612
Official IDMQKHENEVQ6QOCLCDCMIQ
Official Registry DateJul 09, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arona, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeMQKHENEVQ6QOCLCDCMIQ
Post / EVSE Identifier #1VDNZBWS6ITLRMQRBE5OPYL5LN6P
Post / EVSE Identifier #2ES*WEN*EPARKIAVME011
Post / EVSE Identifier #37d655b7b-becb-7a5f-1cbc-727a0ff74ca6
Post / EVSE Identifier #4WABF95TJYCRAKXBGCA0PS53RA0M
Post / EVSE Identifier #5ES*WEN*EPARKIAVME021
Post / EVSE Identifier #65d8dbfc9-2cdc-76a6-1ee9-8f4e6c3c0827
Post / EVSE Identifier #7KFNTU3KAA9CKTIE5TVMR2GV3UQ9
Post / EVSE Identifier #8ES*WEN*EPARKIAVME031
Post / EVSE Identifier #9777da84f-e162-bed1-ab9b-0f78e8fbc9fa
Post / EVSE Identifier #10OKZVHHU5Q915AAKEPEZXMYHLU1R
Post / EVSE Identifier #11ES*WEN*EPARKIAVME041
Post / EVSE Identifier #129eaecaee-7df1-cca7-0f86-9a161fc84ae7

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.051528 | Lon: -16.71612View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
180 m away

DISA CRISTIANOS II

Av. Los Playeros,S/N
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
190 m away

DISA CRISTIANOS IV

Av. Los Playeros, S/N
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7 kW(Standard)
190 m away

DISA CRISTIANOS III

Av. Los Playeros, S/N
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.