150 kW• Ultra-fast🅿️Parking24/7Active in MITECO registry

Parking Centro Canalejas

C. De Alcalá, 17, Centro, Centro, 28014 Madrid, Madrid (28014), Madrid, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity13 bays (20 plugs)
GPS Coordinates40.41788, -3.70007
Official ID2024007313
Official Registry DateDec 02, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
6Charging Bay #6
2 connectors available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
7Charging Bay #7
2 connectors available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
8Charging Bay #8
2 connectors available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
9Charging Bay #9
2 connectors available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
11Charging Bay #11
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
12Charging Bay #12
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
13Charging Bay #13
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007313
Post / EVSE Identifier #1COD20240000047180PR00018973
Post / EVSE Identifier #2ES*ERA*E25365
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000047181PR00018974
Post / EVSE Identifier #5ES*ERA*E25366
Post / EVSE Identifier #6COD20240000047182PR00018975
Post / EVSE Identifier #7ES*ERA*E25367
Post / EVSE Identifier #8COD20240000047183PR00018976
Post / EVSE Identifier #9ES*ERA*E25368
Post / EVSE Identifier #10COD20240000047184PR00018977
Post / EVSE Identifier #11ES*ERA*E25369
Post / EVSE Identifier #12COD20240000047185PR00018978
Post / EVSE Identifier #13ES*ERA*E25370
Post / EVSE Identifier #142
Post / EVSE Identifier #15COD20240000047186PR00018979
Post / EVSE Identifier #16ES*ERA*E25371
Post / EVSE Identifier #17COD20240000047187PR00018980
Post / EVSE Identifier #18ES*ERA*E25372
Post / EVSE Identifier #19COD20240000047188PR00018981
Post / EVSE Identifier #20ES*ERA*E25373
Post / EVSE Identifier #21COD20240000047189PR00018982
Post / EVSE Identifier #22ES*ERA*E25374
Post / EVSE Identifier #23COD20240000047190PR00018983
Post / EVSE Identifier #24ES*ERA*E25375
Post / EVSE Identifier #25COD20240000047191PR00018984
Post / EVSE Identifier #26ES*ERA*E25376
Post / EVSE Identifier #27COD20240000047192PR00018985
Post / EVSE Identifier #28ES*ERA*E25377

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.41788 | Lon: -3.70007View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
5.6 km away

M-Madrid-078

Hilario Herranz Establos,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
50 kW(Fast)
8.0 km away

M-Madrid-042

Aviacion,20
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.