22 kW• Semi-fast24/7Active in MITECO registry

Pamplona - PDR006_CP_BUZTINTXURI_SR

Calle Víctor Eusa, 1, Pamplona/Iruña (31012), Navarra, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity2 bays (2 plugs)
GPS Coordinates42.83000, -1.66690
Official ID4LXDMOFDBHUDS0T5UORK
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pamplona/Iruña, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code4LXDMOFDBHUDS0T5UORK
Post / EVSE Identifier #1HQZ9SHZS3XAQF4F0LYES7UVGTQ2
Post / EVSE Identifier #2ES*ETE*E1292
Post / EVSE Identifier #3322295
Post / EVSE Identifier #45FJMKTBPMBJTOLFJ51M25JQURDN
Post / EVSE Identifier #5ES*ETE*E1293
Post / EVSE Identifier #6322296

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.830005 | Lon: -1.666899View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
740 m away

NA-Pamplona-009

Soto Aizoain,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
1.7 km away

NA-Pamplona-014

San Roque,4
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
23 kW(Semi-fast)
2.1 km away

E-31-Orkoien-001

Empresarial La Muga,12
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.