50 kW• Fast24/7Active in MITECO registry

O-Gijon-009

Óscar Muñiz,8, Gijón (33203), Asturias, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates43.53497, -5.63755
Official ID2024000963
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Gijón, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000963
Post / EVSE Identifier #1COD20240000019803PR00002839
Post / EVSE Identifier #2ES*IBD*E133167
Post / EVSE Identifier #3141561
Post / EVSE Identifier #4141560
Post / EVSE Identifier #5COD20240000019804PR00002840
Post / EVSE Identifier #6ES*IBD*E133168
Post / EVSE Identifier #7141562

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.534971 | Lon: -5.637553View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
760 m away

Torcuato Fdez Miranda

Torcuato Fernández Miranda 2
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
970 m away

Avelino Glez Mallada

Avelino Glez Mallada 27
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7 kW(Standard)
1.6 km away

O-Gijon-015

Conde Real Agrado,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.