50 kW• Fast24/7Active in MITECO registry

MU-Bullas-002

La Copa,0, Bullas (30180), Murcia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates38.05281, -1.66093
Official ID2024000986
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bullas, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000986
Post / EVSE Identifier #1COD20240000019899PR00002935
Post / EVSE Identifier #2ES*IBD*E10896
Post / EVSE Identifier #311500
Post / EVSE Identifier #411499
Post / EVSE Identifier #5COD20240000019900PR00002936
Post / EVSE Identifier #6ES*IBD*E10912
Post / EVSE Identifier #711513
Post / EVSE Identifier #811512

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.052807 | Lon: -1.660932View on OpenStreetMap →

Other Nearby Charging Stations

42 kW(Semi-fast)⛽Estación Repsol
740 m away

Repsol ES, CRED BULLAS

Cr C-415, 43
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
120 kW(Fast)🛒Supermercado Consum
1.0 km away

Supermercado Consum 0179 - Bullas

C. Extremadura, S/N, 30180 Bullas, Murcia
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
120 kW(Fast)
11.4 km away

Cehegín - Calle Ronda Este

Cam. Puertas Claras, 5, 30430 Cehegín, Murcia
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.