50 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Mérida - Hotel Romero

Autovía A-66, Km 630, Mérida (06800), Badajoz, Spain
Network Operator(ZUNDER) Grupo Easychargar SA
Total Capacity3 bays (3 plugs)
GPS Coordinates38.85955, -6.36511
Official ID2023004131
Official Registry DateOct 13, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mérida, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the (ZUNDER) Grupo Easychargar SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004131
Post / EVSE Identifier #1COD20230000015644PR00004578
Post / EVSE Identifier #2ES*ZUN*E0605ER1
Post / EVSE Identifier #3220052
Post / EVSE Identifier #4COD20230000015645PR00004579
Post / EVSE Identifier #5ES*ZUN*E0605ER2
Post / EVSE Identifier #6220054
Post / EVSE Identifier #7COD20230000015646PR00004580
Post / EVSE Identifier #8ES*ZUN*E0605EV1
Post / EVSE Identifier #9220053

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.85955 | Lon: -6.36511View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
30 m away

61926025270002

Mérida
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)🛒Carrefour
5.3 km away

CARREFOUR MERIDA

Carretera de Madrid a Lisboa s/n
Operator:CENTROS COMERCIALES CARREFOUR SA
CCS Combo 2CHAdeMO
1 point • 2 plugs
Details
100 kW(Fast)
6.7 km away

Lavadero Los Bodegones

Avenida Reina Sofia, 27
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.