22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Poligono Ertzilla, Bizkaia

Poligono Ertzilla, 7, Iurreta (48215), Bizkaia, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates43.17967, -2.64843
Official ID3DWWXCURKW1ZTY7RBOVJ
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Iurreta, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code3DWWXCURKW1ZTY7RBOVJ
Post / EVSE Identifier #12EJVODCFPCSIIIZJUO949TNHRGM
Post / EVSE Identifier #2ES*REP*E15201*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4FHSWOQTHRY9GO2DNAGKLUVSNVCR
Post / EVSE Identifier #5ES*REP*E15201*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7JGYG1JKLKKVE7SLRMHPKQBKKI5M
Post / EVSE Identifier #8ES*REP*E15202*1
Post / EVSE Identifier #9EJBPZNRSNQATSIF7L9WNW7X3AIQ
Post / EVSE Identifier #10ES*REP*E15202*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.179666 | Lon: -2.648431View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.4 km away

E-BI-Durango-003

San Roke Auzoa,22
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
2.6 km away

Barrio BERNA

Berna,4
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
1 point • 2 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
3.4 km away

Hotel San Blas

Laubideta, 7
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.