22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, JESÚS NAZARENO, Sevilla

Avda. Jesús Nazareno, 38, Cabezas de San Juan, Las (41730), Sevilla, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity2 bays (2 plugs)
GPS Coordinates36.98943, -5.93801
Official IDVENCN6A0GUSZNNXKNXSK
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cabezas de San Juan, Las, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeVENCN6A0GUSZNNXKNXSK
Post / EVSE Identifier #1AJCTPVATD4Y0EHHCBHFBNH4OL0J
Post / EVSE Identifier #2ES*REP*E16975*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4JMEXGIQ7WBP4TKWKNS4JEIUYROH
Post / EVSE Identifier #5ES*REP*E16975*2
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 36.989428 | Lon: -5.938007View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
230 m away

61926025270005

Av. De Federico García Lorca, 51, 41730 Las
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)
530 m away

61934038200015

C. Blas Infante, 37, 41730 Las Cabezas De
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.