22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Grande, Toledo

C/ Grande, 49, Quintanar de la Orden (45800), Toledo, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates39.59416, -3.04216
Official IDVJGN8K1EY8PPENY1BI6Y
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Quintanar de la Orden, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeVJGN8K1EY8PPENY1BI6Y
Post / EVSE Identifier #1XLSLUXDDU4UUA7IDXGFP9TBGSDD
Post / EVSE Identifier #2ES*REP*E11793*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4CAIQT9SFPWQ7FSDQTMROQ35AJJ6
Post / EVSE Identifier #5ES*REP*E11793*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7PHHYZO5VCX3Y7Y72KD7WF88QRDE
Post / EVSE Identifier #8ES*REP*E11799*1
Post / EVSE Identifier #94NI9ZQUSA8SSR1A4RC9MGJK70ZR
Post / EVSE Identifier #10ES*REP*E11799*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.594162 | Lon: -3.042161View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
530 m away

AhorraMas C. Vallehermoso

C. Vallehermoso, Quintanar De La Orden 6
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
7.7 km away

AhorraMas Miguel Esteban

Crta Cm-310 De Quintanar De La Orden A Alcaza
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
22 kW(Semi-fast)🛒Supermercado Consum
17.7 km away

20XP22T3KK4AL01160

Consum - C, Cam. Real Baja, 17, 16630 Mota
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.