22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Fernando Múgica, Gipuzkoa

Fernando Mugica Kalea, 1, Donostia/San Sebastián (20018), Gipuzkoa, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates43.28052, -2.01765
Official IDPJYOCKR4MELCBULMZ4NF
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Donostia/San Sebastián, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodePJYOCKR4MELCBULMZ4NF
Post / EVSE Identifier #1BPDNVXAIVDUA5EADUZL1TYEXTZS
Post / EVSE Identifier #2ES*REP*E13807*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4BYRUE8K4AVRVQBNDNXZYYYHASL7
Post / EVSE Identifier #5ES*REP*E13807*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7ZGZZGUPJSEOHIXTU0NNJGQQCOVS
Post / EVSE Identifier #8ES*REP*E13808*1
Post / EVSE Identifier #9TRWGOJXVHMFUXF3HJVNU035ZRHY
Post / EVSE Identifier #10ES*REP*E13808*2
Post / EVSE Identifier #11PQP3ELEPA9PUC0U2SBEPTIJGO6N
Post / EVSE Identifier #12ES*REP*E13809*1
Post / EVSE Identifier #13HNSTK8USAH8YRFO8PMPOUFHYFBY
Post / EVSE Identifier #14ES*REP*E13809*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.280519 | Lon: -2.01765View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏬Centro Comercial
710 m away

ACCIONA - C.C. Urbil 01

Barrio Txiki-Erdi, 7
Operator:ACCIONA Recarga
CCS Combo 2Tipo 2 (Mennekes)
6 points • 6 plugs
Details
50 kW(Fast)🏬Centro Comercial
720 m away

ACCIONA - C.C. Urbil 02

Barrio Txiki-Erdi, 7
Operator:ACCIONA Recarga
CHAdeMOTipo 2 (Mennekes)CCS Combo 2
13 points • 13 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.