22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Ctra. Tejina, Tenerife

Ctra. Tejina Tacoronte (Tf16), 9, San Cristóbal de La Laguna (38260), Santa Cruz de Tenerife, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates28.53292, -16.36910
Official IDPNFVFNXGUU96NJENEYQD
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Cristóbal de La Laguna, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodePNFVFNXGUU96NJENEYQD
Post / EVSE Identifier #1BYGRCMLRYNVLXEHGGKYJHVT2QQQ
Post / EVSE Identifier #2ES*REP*E13849*1
Post / EVSE Identifier #31
Post / EVSE Identifier #45VXABBVICOKNEOXH7P6XQTJTDXM
Post / EVSE Identifier #5ES*REP*E13849*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7TALA5PALEMYPJ2LSXGNFENXJ6YE
Post / EVSE Identifier #8ES*REP*E13851*1
Post / EVSE Identifier #99GF9DQFYQC9IRROPIR9RJI6OYT3
Post / EVSE Identifier #10ES*REP*E13851*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.532918 | Lon: -16.369102View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
6.3 km away

DISA TACORONTE

Carretera General Del Norte Tf, Pk 152
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
3 points • 3 plugs
Details
22 kW(Semi-fast)
9.3 km away

E-TF-LaLaguna-004

Pico Cho Canino,8
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.