22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Bloque Logístico Parc Sagunt

Av. Sequia De L'arrit, Sagunt/Sagunto (46520), Valencia/València, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates39.64332, -0.24821
Official IDISJOVDDL33XHPJT8C3EW
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sagunt/Sagunto, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeISJOVDDL33XHPJT8C3EW
Post / EVSE Identifier #1QFUNKYTDCB5NABOJF6WVKNX63YN
Post / EVSE Identifier #2ES*REP*E9931*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4UI5FT1UPLVV0VJ3V6EHUO4JIP62
Post / EVSE Identifier #5ES*REP*E9931*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7ORTDAGMDVKWWZ3CE5SADNEQYU4X
Post / EVSE Identifier #8ES*REP*E9932*1
Post / EVSE Identifier #9K5YH1C2LTQIK98JE2CA53EMQ6VE
Post / EVSE Identifier #10ES*REP*E9932*2
Post / EVSE Identifier #11PHTQ169GZPDQTRQQH3YXWLKV4HI
Post / EVSE Identifier #12ES*REP*E9942*1
Post / EVSE Identifier #13SH4QHLID0P3P24TCE3JISTKMTC9
Post / EVSE Identifier #14ES*REP*E9942*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.643318 | Lon: -0.248213View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.4 km away

Vidanova Parc - Sur

Junto Ct Benjamin Franklin C401713 (Cc Vidano
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
4 points • 8 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.