22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, Barrio Santa Barbara

Paseo De Santa Barbara, Soria (42005), Soria, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity4 bays (4 plugs)
GPS Coordinates41.77198, -2.47355
Official IDKQWB1AMNEPKRNMVU0GF3
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Soria, belonging to the province of Soria (Castilla y León, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeKQWB1AMNEPKRNMVU0GF3
Post / EVSE Identifier #1JWRQCIJLEFRBLEGU7OZFOM3QKAS
Post / EVSE Identifier #2ES*REP*E14093*1
Post / EVSE Identifier #31
Post / EVSE Identifier #4YMOUO0MTHN5HGZ9SCAKBALBGF9Q
Post / EVSE Identifier #5ES*REP*E14093*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7VWTAYNLU5JPICX7W80X02SJ1MZG
Post / EVSE Identifier #8ES*REP*E14094*1
Post / EVSE Identifier #9NTZQ1KMXKGDNQ9XRCSIRQ64UQIS
Post / EVSE Identifier #10ES*REP*E14094*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.771982 | Lon: -2.473549View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
920 m away

SO-SORIA-005

Las Casas - Calle A,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.59 kW(Semi-fast)
1.1 km away

Soria - Plaza del Olivo

Plaza Del Olivo, S/N
Operator:P-APP & WEB SERVICIOS DIGITALES S.L.U.
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
240 kW(Ultra-fast)🏬Centro Comercial
2.1 km away

Centro Comercial Camaretas

Calle M Camaretas
Operator:Punto Recargas SL
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
28 points • 28 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.