22.17 kW• Semi-fast🛒Supermercado Mercadona24/7Active in MITECO registry

Mercadona, 4204, Vilar de Toba, A Coruña

Lg. Vilar De Toba, S/N, Cee (15138), Coruña, A, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity6 bays (6 plugs)
GPS Coordinates42.97304, -9.19174
Official IDNU7QQ7V2JHPN5BJHQBOO
Official Registry DateJun 01, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cee, belonging to the province of Coruña, A (Galicia, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeNU7QQ7V2JHPN5BJHQBOO
Post / EVSE Identifier #1HMTZ1STNFXUYKZZPXNHKDPO7YW4
Post / EVSE Identifier #2ES*REP*E10964*1
Post / EVSE Identifier #31
Post / EVSE Identifier #45LGOBMYZLZVUBNQIONVEXAZPTVT
Post / EVSE Identifier #5ES*REP*E10964*2
Post / EVSE Identifier #62
Post / EVSE Identifier #7AJOOFLQ5ZH1ONSXSUH5ECA8IMVX
Post / EVSE Identifier #8ES*REP*E10970*1
Post / EVSE Identifier #9JW1ASM6UW3JUWISGY811VS1DU9L
Post / EVSE Identifier #10ES*REP*E10970*2
Post / EVSE Identifier #11HTTKQ0SGGKQUMM5VIUJS3WXY9YL
Post / EVSE Identifier #12ES*REP*E10972*1
Post / EVSE Identifier #13CD8DH9AEYWYPK5VNYSZUJNEM5ST
Post / EVSE Identifier #14ES*REP*E10972*2

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.973041 | Lon: -9.191738View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
460 m away

61945052640008

Low Cost Repost - Parque Empresarial De Cee,
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)⛽Estación Repsol
790 m away

Repsol ES, Bazarra S.L.

Lugar De Bazarra, 64
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
22 kW(Semi-fast)🛒Eroski
20.1 km away

EROSKI CITY VIMIANZO

Calle Trasariz 59-61
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.