22 kW• Semi-fast24/7Active in MITECO registry

LOBIOS CALDARIA

Lg Bubaces, 73, Lobios, Lobios (32895), Ourense, Spain
Network OperatorENERGEA CONSULTING Y ASESORES SL
Total Capacity1 bay (2 plugs)
GPS Coordinates41.86259, -8.10615
Official ID2024001755
Official Registry DateMar 01, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lobios, belonging to the province of Ourense (Galicia, Spain). The charging equipment and commercial operation belong to the ENERGEA CONSULTING Y ASESORES SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001755
Post / EVSE Identifier #1COD20240000024300PR00004232
Post / EVSE Identifier #2ES*ENE*E018
Post / EVSE Identifier #3C01
Post / EVSE Identifier #4C02

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: HOTEL, CAFETERÍA, APARCAMIENTO, NATURALEZA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.8625874 | Lon: -8.10614541View on OpenStreetMap →
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.