50 kW• FastHorario habitualActive in MITECO registry

LO-Logroño-010

Mendavia,14, Logroño (26009), Rioja, La, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates42.47194, -2.41745
Official ID2024001025
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Logroño, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001025
Post / EVSE Identifier #1COD20240000023100PR00003043
Post / EVSE Identifier #2ES*IBD*E155311
Post / EVSE Identifier #3164781
Post / EVSE Identifier #4COD20240000023099PR00003042
Post / EVSE Identifier #5ES*IBD*E155294
Post / EVSE Identifier #6164768
Post / EVSE Identifier #7164767

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📅Advance slot reservation supported
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.471943 | Lon: -2.417448View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏬Centro Comercial
1.1 km away

ACCIONA - C.C. Berceo

Calle Lérida, 1
Operator:ACCIONA Recarga
CCS Combo 2Tipo 2 (Mennekes)
17 points • 17 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
1.6 km away

Hostal Mesón Pepa

Av. Aragón, 9
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
14 kW(Semi-fast)
1.7 km away

LO-Logroño-013

Duquesa De La Victoria,74
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.