350 kW• Ultra-fast24/7Active in MITECO registry

Lleida

Camí Vell, Alpicat (25110), Lleida, Spain
Network OperatorIONITY GmbH Sucursal en España
Total Capacity6 bays (6 plugs)
GPS Coordinates41.64986, 0.56375
Official ID2024006583
Official Registry DateOct 30, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alpicat, belonging to the province of Lleida (Cataluña, Spain). The charging equipment and commercial operation belong to the IONITY GmbH Sucursal en España network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
5Charging Bay #5
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
6Charging Bay #6
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006583
Post / EVSE Identifier #1COD20240000044867PR00016988
Post / EVSE Identifier #2ES*IOY*E469004
Post / EVSE Identifier #3ac9ea671-04f1-4f0f-8c93-c91979d9d997
Post / EVSE Identifier #4COD20240000044868PR00016989
Post / EVSE Identifier #5ES*IOY*E469003
Post / EVSE Identifier #6316aca33-698f-4a6e-9949-1319b6bff20a
Post / EVSE Identifier #7COD20240000044869PR00016990
Post / EVSE Identifier #8ES*IOY*E469002
Post / EVSE Identifier #9f10e9e8b-2708-4f7d-b04b-2a493105d326
Post / EVSE Identifier #10COD20240000044870PR00016991
Post / EVSE Identifier #11ES*IOY*E469001
Post / EVSE Identifier #120f08979b-3777-40bb-8b35-b8df0eabe1e8
Post / EVSE Identifier #13COD20240000044871PR00016992
Post / EVSE Identifier #14ES*IOY*E469005
Post / EVSE Identifier #15f020982c-ea71-49ce-82e2-ce1b3f46b7a8
Post / EVSE Identifier #16COD20240000044872PR00016993
Post / EVSE Identifier #17ES*IOY*E469006
Post / EVSE Identifier #18957fee99-afc0-4533-b79e-e491523e37ee

Theoretical Charging Times at Maximum Power (350 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0.1 hours)
40 kWh Battery~7 min(~0.1 hours)
60 kWh Battery~10 min(~0.2 hours)
80 kWh Battery~14 min(~0.2 hours)

Opening Hours

Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Martes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.649858 | Lon: 0.563747View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
2.4 km away

Alpicat

Passeig del Parc S/n (Pavello municipal)
Operator:AYUNTAMIENTO DE ALPICAT
Tipo 2 (Mennekes)
1 point • 1 plug
Details
180 kW(Ultra-fast)
3.6 km away

L-TORREFARRERA-002

Mestral,S/N
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.