22 kW• Semi-fast24/7Active in MITECO registry

Ibis Budget Logroño

Marques De San Nicolás, 101-105,, Logroño (26001), Rioja, La, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates42.46714, -2.44819
Official IDZGIZ2QUIFWALUOGHJRGM
Official Registry DateAug 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Logroño, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZGIZ2QUIFWALUOGHJRGM
Post / EVSE Identifier #1NADYVUNA22PS5H85GSFWWJNQ6QD
Post / EVSE Identifier #2ES*WEN*EIBISLOGRONO021
Post / EVSE Identifier #3727aaa55-917d-6543-c384-797e7389558c
Post / EVSE Identifier #4DLWV7SGH8PLRDKXHDTFF07AIGOH
Post / EVSE Identifier #5ES*WEN*EIBISLOGRONO031
Post / EVSE Identifier #6b8745985-a79e-b2a5-9c4e-c5fa09fcfe17
Post / EVSE Identifier #7SEARSFK8BARFXYN4MQIWM9OUWDU
Post / EVSE Identifier #8ES*WEN*EIBISLOGRONO041
Post / EVSE Identifier #943aecfe0-ac7b-c547-eb3b-580f7c1cd7af
Post / EVSE Identifier #100OBXHNDNGVA6UVF7KAERGV2ODB0
Post / EVSE Identifier #11ES*WEN*EIBISLOGRONO011
Post / EVSE Identifier #121eca4ff5-a740-9963-2b96-e8d8cdeb700a

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.46714 | Lon: -2.44819View on OpenStreetMap →

Other Nearby Charging Stations

14 kW(Semi-fast)
1.2 km away

LO-Logroño-013

Duquesa De La Victoria,74
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.