22 kW• Semi-fastHorario habitualActive in MITECO registry

HU-Barbastro-004

Pablo Sahun,2, Barbastro (22300), Huesca, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates42.03469, 0.12781
Official ID2024004980
Official Registry DateSep 23, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barbastro, belonging to the province of Huesca (Aragón, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004980
Post / EVSE Identifier #1COD20240000040808PR00012982
Post / EVSE Identifier #2ES*IBD*E233319
Post / EVSE Identifier #3245554
Post / EVSE Identifier #4COD20240000040809PR00012983
Post / EVSE Identifier #5ES*IBD*E233320
Post / EVSE Identifier #6245555

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Domingo (00:00 - 00:00) Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Viernes (09:00 - 21:30) Sabado (00:00 - 00:00) Jueves (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.034688 | Lon: 0.127809View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
1.9 km away

TotalEnergies - Hotel Rey Sancho Ramirez

Hotel Rey Sancho Ramirez N-240, Km 162
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
250 kW(Ultra-fast)🏨Hotel / Alojamiento
2.0 km away

Barbastro, Spain

Ctra. N-240 Km. 162, Hotel Rey Sancho Ramírez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
22 kW(Semi-fast)
3.4 km away

E-HU-Barbastro-002

Industrial Valle Del Cinca,48
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.