22 kW• Semi-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

HOTEL PUENTE DE LA TOJA

RUA CASTELAO 206, Grove, O (36989), Pontevedra, Spain
Network OperatorHOTEL PUENTE DE LA TOJA S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates42.48789, -8.85793
Official IDADWELX4TBW24MKSZCJKX
Official Registry DateFeb 13, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Grove, O, belonging to the province of Pontevedra (Galicia, Spain). The charging equipment and commercial operation belong to the HOTEL PUENTE DE LA TOJA S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeADWELX4TBW24MKSZCJKX
Post / EVSE Identifier #1WJ0TFB8TGVYL8R2V0C4F2HZPP3M
Post / EVSE Identifier #2ES*PLT*E0001
Post / EVSE Identifier #301

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO

Accessibility & Amenities

Accessibility: SI. Additional amenities: HOTEL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.4878914 | Lon: -8.8579337View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
5.4 km away

E-PO-Cambados-001

Vilariño,103
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
5 kW(Standard)🏨Hotel / Alojamiento
6.4 km away

Hotel Spa Atlántico

Lg. Granxa, 15 San Vicente do Mar, Pontevedra
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.