200 kW• Ultra-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel Holiday Inn

Carrer Del Danubi, S/N, Sant Cugat del Vallès (08174), Barcelona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity4 bays (4 plugs)
GPS Coordinates41.48640, 2.05009
Official IDEWLIU4ZJLPOWUEKQKA38
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Cugat del Vallès, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:289 A
2Charging Bay #2
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:289 A
3Charging Bay #3
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:289 A
4Charging Bay #4
1 connector available
CCS Combo 2
200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:289 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeEWLIU4ZJLPOWUEKQKA38
Post / EVSE Identifier #1IPEMGMCJ6NRSFZBETFO98YK0XYE
Post / EVSE Identifier #2ES*ETE*E48972
Post / EVSE Identifier #3100061019
Post / EVSE Identifier #4O3RBVV7ZNVKKDRHCUQ331UWGDRV
Post / EVSE Identifier #5ES*ETE*E48892
Post / EVSE Identifier #6100061018
Post / EVSE Identifier #7UQT9P8Z7ZM3LH1TSFAA05KWAZ0V
Post / EVSE Identifier #8ES*ETE*E48973
Post / EVSE Identifier #9100061020
Post / EVSE Identifier #10EEOO0QYDVRUUQLUTYERLC3JDQHK
Post / EVSE Identifier #11ES*ETE*E48974
Post / EVSE Identifier #12100061021

Theoretical Charging Times at Maximum Power (200 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~6 min(~0.1 hours)
40 kWh Battery~12 min(~0.2 hours)
60 kWh Battery~18 min(~0.3 hours)
80 kWh Battery~24 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.486401 | Lon: 2.050093View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.