100 kW• Fast24/7Active in MITECO registry

Hiperber San Pedro del Pinatar - 01

Miguel De Unamuno,4, San Pedro del Pinatar (30740), Murcia, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates37.83232, -0.79269
Official ID2025000553
Official Registry DateMar 12, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Pedro del Pinatar, belonging to the province of Murcia (Murcia, Región de, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000553
Post / EVSE Identifier #1COD20250000051079PR00002057
Post / EVSE Identifier #2ES*FCT*E228349
Post / EVSE Identifier #3240309
Post / EVSE Identifier #4COD20250000051080PR00002058
Post / EVSE Identifier #5ES*FCT*E228350
Post / EVSE Identifier #6240310

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.832323 | Lon: -0.792689View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
8.0 km away

E-A-Orihuela-019

Teodoro Llorente Campoamor,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.